Laserfiche WebLink
• . ~ ~ <br />.._ ~ !2) <br />Hoisting. <br />iYethod employed maohinery- drives by steam by whioh men ere <br />_ r. <br />raised an~w~Owerect Height of load holsted,1500 lbs.-~istenoe <br />''hoisted 165 feet-oable 3/~F inoh steel-Yaterisl hoisted-tram <br />one level-Hell roDn I/2 inoh manilla-Yining Bureaus oode of <br />.signals used,whioh are posted in engine room and ooiiar of <br />shaft. <br />Stine methods. <br />Sloping end drltting ere the methods employed-lto maohine drill <br />used-single bend drilling-Timbering by Betts,end at~l~~-IJnder- <br />ground tramming by men with oMiaary mine oars oa H ib.to the <br />yard rail-amount of water dealt with I00 gnls.per minute. <br />System employed Eo.7 Oemeron sinker with eteem.Ventilation- <br />natural draft-lto noxious gases met with bighting underground, <br />aandiee. <br />Exits. <br />shaft ie divided into two oompartments with ladder wny in good <br />oondition-Eo oonneotions with other shafts. <br />statistios. <br />lto Droduotion of ore at present time. <br />Development. <br />Totel.Eo.ot teat in shatter-175.-OOSt per toot:-X25.00. <br />r r r r <br />r r r r <br />r r r r <br />~ Yiners. <br />2 Engineers. <br />• drifts:-I05.- r r <br />• upraise:-50.- r r <br />r :-1E.00. <br />r :-17.00. <br />• development:330. <br />Yen employed. <br />13.50• per day. <br />14.00. r r <br />S hour shift. <br />~ r r <br />~rerege Eo.ot men employed for the year:-6. <br />Oost. <br />poet of iuei :-15.5u.per ton.-lrsrage oost per month:-1125.00. <br />• • timber 122.per I000. r" • r r r :-150.00. <br />• • powder 15 Ote.per lb.- r • • r ;-160.00. <br />Eo produotioa of ose-Oeueral remarks-111 pits,end shatt• oove~d <br />or tilled inalo persons under I2 yeses employed-111 aooideats <br />reported to Bureau of Yinse-ltiue oarrys no in~emr-ity ineuraaos- <br />. ~. <br />Y1ns oarrys no insuraaee for employees-]line i~~ sot a regular <br />produosr,and'hu sot been worked ooatinuoueiy -lroperty is not <br />sub-laved. <br />