Laserfiche WebLink
Pittsburgh - 3. <br />MIHIIIG ~ MIBE METHOD S- Contin. <br />Bo new development has been done sinoe the time of the <br />last report and sotive worir is oonYined to stoping in the ~ ~' <br />9th and 10th levels on the east aide of the shaft:" <br />S T A T I S T I C S. <br />Tally described in report of September 11 1914, exoept <br />Average tonnaEe per month, 240. <br />6,veraga valve of ore per ton, ?35. <br />Men employed. ' <br />2 Me.ohiae Drillman, $3.b0 for 8 ' hour shift. ' <br />7 Miners, ~ 3:00" " " " " <br />2 Timbermen, 3.50 " " " " <br />2 Tremmere, 3.60 " " " " <br />3 Ore Aesorters, 3.OU " " " " <br />1 Sopman, 3.00 " " " " <br />2 Eagiaeere, 3.50 " " " <br />2 Pumpaen, 3.b0 " " " <br />2 8laokemiths,,~3.00 Ps 4.00 " " " " <br />1 Superintendent, 2UO.U0 per month. <br />Average number of men employed for the year, 24, <br />GE lIF. RA7. REMARK 8 . <br />Fully described in repprt of September 11, 1914. <br /> <br /> <br />