Laserfiche WebLink
szs <br />T I T L E <br />Vested in the C.B. & N. Mining Comparq.,organized under the <br />Saws of the state of Colorado, tivith a capital stock oP <br />1,250,000 shares of the par .value of $1,00 each, <br />Principal oPpioe located at Colorado Springs, Colo. <br />w.H. Davie, President Esoandido, Calif, K, 1[oDermid, Seo. <br />and Geri~l 3[gr, Cripple Creek, Colo, Leased iti Blocks <br />Average tonnage per month 250, <br />All Fully reported in Haroh,1912, Eacept, <br />DEVELOpMEIdT: <br />Total number of feet <br /> <br />Odat per foot $25 ahaPte <br />1 <br />60 <br />" 3 <br />Total'hulnber of feet in drift <br /> <br />Cost per foot $10, s and levels <br />4150 <br />Total number of feet <br />Coat per foot $10 in orosa outs <br />, 2800 <br />Coat p~ foot $BPOOt ~ °~izes and raises 1150 <br />Total member of Peet it1 development 9460 <br />NEN ELQ~LOYED <br />i <br />, <br />j 5 maohine drill men <br />1 timbermsn 8 hours <br />4.00 <br />5 tramnere " 3,50 <br /> <br />~ ortera <br />j ~ ~~i~eers " 5,00 <br />" 3.00 <br />1 blaoksmith " 4.00 <br />1 topman " 4,00 <br />A9pZ'ag° rnuuber oP men employed for the ye <br />r 1 <br /> a <br />8 <br />COSTS: <br />Cost o P fuel $6.25 averago oost er month <br />A•rarag a cost oP timbers per month $50, $250, <br />Average ooat of stoel per month $20, <br />~ Avoroge ooat of oil per Ironth $5,00 <br />Coat o P powdor 18-1~2 ota 1b, average oost por n;onth$29o <br />j Average assay valuo of oro por ton $25, <br />I Cost pee ton for mining same $8,00 <br />Cost par ton for tran sportation and treatment $6,50 <br />~ 6EIJENAL RF?,(ANKS. <br />~ A11 shaPta, pits and othor exoavations on property ecourely <br />ooversd or fonood. <br />All aooidents havo Ix3on roportod to the Duroau oP 111nes, <br />Mine oarries indemnity inmiranae in Tha London Guarantee <br />Company, <br />111ne is a regular produoer end is worked oontiuously, <br />dlanagenu3nt is familiar frith the otatutns relating to <br />th° oparatlon of metalliferous minas, <br />