Laserfiche WebLink
PAGE 2. <br />• <br />PAGE 40--90L. 3..:..10/16/1897 er ~ <br />PAGE 41--WL. 3..::. 4/12/1898 <br />Development; Shaft 900 ft. Levels E: Drifts 1,595 ft. <br />Ore; Iron Sulphide, Gold, Spar, fb rphyry, Schist, Quartz, Granite, Average-- <br />IvLilling X10.00 to y15.00/T. Smelting, X50.60 to X80.00/T. <br />• Labor; 18 meu. ' <br />e <br /> <br />C <br /> <br />s <br />s. <br />C <br />s. <br />