Laserfiche WebLink
-4- <br />I level to surface and by tunnel level to surface all levels <br />are connected b~~ good'manegy~i with ladders not to exeaed <br />?..n feet apart and 1n food shape ane1. ready at ai"i twee for <br />employes. <br />S TAT I S '~ I C S: <br />Total number of 1'ePt in raia~es 1000 ft eost ner ft $40.00 <br />Total number of feert in Tunn~iis 24b0 ft cost'per fE X25;00 <br />Total nurabar of feet in drifts or levels 20.Y~Ob ~8:fl0 <br />Total number of feet in develoTRtnPnt 215,4~b <br />Cost of noal average rPr. month ~4G0.00 <br />Cost of timbers p9r mtiith #5,000.00 <br />Cost cf St P,P,l9 ner month X100,00 <br />Oost of oi5 per month ~loO.Ob <br />Cost of powder` user month '~~2do.00 <br />Cost of trsnsp~rtit~' z3lipn i.e~ to mine '~;'05 pglt bvA~' tram. <br />Average a's~8y vatue• bre nb~' t~Ti ~7:`50~. <br />Cost per ton mining-'ore X1;80 <br />° Cest of transporting "ore to tniZ1 $.i5 <br />Cnat per ton treatment of nr? X1,00 <br />MEN E`MP''L'b`Y'`ED. • <br />20 mae3itY19 drillmen 4.00 fOr '~ hou?° shift • <br />~ 5 maehYne helpers 8.50• " <br />15 miners 3.00 " <br />40 timbarmen 8.50 • " <br />20 Trammers 3.00 " <br />10 topmen 3.00 " <br />5 laborers 8.40-~'- ". <br />2 8s$ayer8 '4.00 " <br />8 firemen ~ 8.00 " <br />4 blacksmiths 4.00 " <br />2 Teamsters 3.25 " <br />8 foreman 4.50 " <br />S office helpers 4,50 " <br />s0 millmen 3. b0 " <br />7 BOgh men 8.00 " <br />l0 trammway men 8.50 " <br />Average number of raen employed for the year 220. <br />