Laserfiche WebLink
'f' <br />;d I N I N G (Continued, ) <br />~f~ <br />~,~ ~. <br />~:~ <br />Lrainage is natural through ditch on right aide of tunnel entrance. <br />jl Ventillation is natural and sufficient, iioxious_gaaea are not mat <br />jI. <br />with, <br />~~ Sanitary conditions are good. <br />All old timbers have been removed from .under ground workings <br />!~ wherever necessary. <br />;dine has a double exit. <br />P:ellington tunnel being connected with ;dountain tunnelby a raise <br />°, <br />of 120 ft <br />i <br />~ The exits are readily accessible for employees. <br />i <br />Lighting under ground by candles, <br />S T A T I S T I C S. <br />'j Development, <br />1fj Total. No it in shaft 2R0 ft <br />`~ -Total No ft in tunnel <br />,' Total IIo ft in raise <br />Vil' Total f•IO Yt in development work <br />;den employed <br />~i <br />'•~i ? Ninera $3,00 for 8 hr shift <br />,~1 <br />f ~ 1 Trarmaer $R,00 " <br />1 Foreman $3,50 <br />Cost, <br />P.verage cost timber per month <br />Average coat steel per month <br />Average cost powder i~er month <br />Average assay value ore per ton <br />Cost per ton mining of ore. <br />Coat per ton transporting ore <br />Cost per ton treatment of ore <br />i <br />li <br />280 ft <br />2100 ft <br />200 ft <br />2580 ft <br />$50.00 <br />$ 5.00 <br />$17,00 <br />$20.00 <br />$ 2.00 <br />2,R5 <br />$ 4,00 <br /> <br />