Laserfiche WebLink
-s- <br />The water euppl-- is from the bank of San Juan turnzel. <br />Electricity is used for lighting. Surface transporta- <br />tion is done by wagon and pack train. <br />E F. ~ L O S I V E S. <br />40~ to 60~ Gelatine, Z L and Neptune Elise and wooden <br />tamping bars are used. <br />All excess powder ie stored in a frame building about <br />250 feet, from tunnel with ridge of ground between. <br />10 tons of powder are stored therein chiring the winter <br />time. The flerice for thawing powder la 8 frame build- <br />ing, with moisture and air proof walls and roof well <br />ventilated. <br />LfI A*I NG AI1P MI NE },{ETFI OD S. <br />The main opening is an old shaft on Sweepstanea claim <br />it 1a E75 Peet deep, with short dTifte at 100, 2DD <br />and 30C foot le^els. Work is carried on in a tunnel <br />on mt Sneffeie 3elle claim, 2DDD fast distant. <br />The main alit is being driven 7~ feet high by 6 feet <br />aside b•• about 2,0^~rifeet long to cut rein about 90^ feet <br />below outcrop. ?resent length about 150 feet of old <br />work; new work at. face to commence about Dec. 15th, or <br />before . ' <br />The balcY,smith shop and air compressor room are near <br />entrance of tunnel, these buildings are frame. <br />Ingersoll C-110 machine drills are used. Only tunnel <br />gets are used at portal. Underground tramming is clone <br />by hand and mules. The system of ventilation is a fan <br />(both exhaust and blow) driven by 5 HP motor-12r rent <br />pipe. Candles are used for lighting underground. <br />M E 1: *, M p L O Y E D. <br />6 machine drillmen <br />#4.00 for 8 hours <br />3 Machine help~ra 4.00 r <br />9 Arizekera S. DD <br />3 trammera 3.00 r <br />3 laborers 3.00 <br />1 ma chin~st S.OD r ' <br />2 blaokemiths 4.00 r <br />