My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00040
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2009 11:47:43 AM
Creation date
11/18/2007 11:52:14 AM
Metadata
Fields
Template:
Mine Books
County
Ouray
Volume
14
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-4- - - <br />4J~ <br />All old timbers have been removed from underground and the <br />sanitary conditions are good. <br />The man way contains air pipe only. <br />The Mine has two exits through levels. These are connected <br />by inclines and manways. <br />the system of lighting underground is electricity and candles. <br />S T A T I S T I C S. <br />Average tonnage per month 200. <br />'total number of feet in tunnels 2700. Cost per foot X20.00 <br />Total number of feet in drifts 8000. Coat per foot $12.00 <br />Total number of feet in cross-cuts1000.Cost p~:r foot X15.00 <br />Total number 6f Feet in winzes 2000. Cost per foot $10.00 <br />Cost of fuel per ton, Average cost por month15,00 <br />Cost of timber Average cost per month V50.oo <br />Cost of steel, Average coat per month X15.00 <br />Cost of Oil, Average coat per month 5.00 <br />Cost of Powder, Average cost per month 100.00 <br />Cost of transportin;; supplies to mine, per month 50.00 <br />Average assay value ore pe: ton 22.00 <br />Coat per ton minin;~ of ore 3.50 <br />Cost por ton transporting ors:, 3.00 <br />Cost per ton treatment of ore, l.oo <br />MEIv EMPLOYE D. <br />2 Machine Ur111 men $4.50 for Eight hours, <br />2 Miners 3.50 for Eight hour., <br />1 Timberman, 4.00 for Eight hours, <br />1 Trammer, 3.00 for Eight hours, <br />2 Ore Assorters, 3.00 for Eight hours, <br />1 Engineer 4.00 for Eight hours, <br />1 Blacksmith 4.00 for Eight hours, <br />1 Foreman 5.00 for Eight hours, <br />2 Millman 3.50 for Eight hours, <br />Average number of men employed for the yeur 13. <br />G E N E R A L R E M A R K S. <br />No porson under the age of 12 years is employed in the !dine. <br />Strangers or visitors are not allowed undorground unless <br />accompanied by a competent guide familiar with the Mine. <br />
The URL can be used to link to this page
Your browser does not support the video tag.