Laserfiche WebLink
-4- 4 ii i <br />ST ATI S.TI C S. <br />Total number of feat in shafts 80. <br />Total number of feet in edits 1730 - <br />Total.number of feet in drifts 210 <br />Total number of feet Sn cross-cuts 58 <br />Total number of feet iri winzes 330 <br />Total number of Peet in de~eiopement 2188 <br />Average tonnage per month 1550. <br />Cost of flzal $9.25 per ton <br />Cost of tim bar 6~ per foot. <br />Cost of powder $.14 per pound. <br />Cost cf transporting supplies to mine $.50 per ext. <br />Average assay value per ton $50 smelting ore & $15 milling ore. <br />Ccat oP mining ore $3.00 per ton. <br />Cost of transporting ore $4.50 per ton. <br />Cost of ore treatment $6.00 per ton. j <br />}.4 E N E M P L O Y E D. <br />10 kachine d~illnen $4.00 for 8 hours. <br />4 machine helpers 3.50 + <br />20 mlliers 3.00 • I <br />4 timbermen 4.00 » <br />10 tramcars 3.00 • <br />i <br />1 topman 3.00 • <br />2 laborers 3.00 s <br />1 assayer 100.00 per month. <br />4 engineers 4.00 • <br />', <br />2 firemen 3.50 • <br />2 blacksstnitha 4.00 • <br />1 foreman 5.00 • <br />1 superintendent 250.00 + <br />1 Office help 100.00 <br />12 mailmen 3.50 ~ <br />a ENE E A L R E M A R K 8. <br />No per son under the age of twel~~e years is employed in <br />the mine. Strangers or ~isitora are not eiioxed underground <br />unless accompanied by a guide Pemiilar xith the mine. <br />611 accidents have been reported to the Bureau of !dines. ~ <br />