Laserfiche WebLink
<br />STAtISTICS. <br />The average tonnage per month ie 1500 tons. <br />Tha total no. of ft. in shafts is 4800. Coat per Yt, $30. ~~ • <br />' - <br />15 miles in drlYts or levols. Cost per Yt. $10. <br />2600 Yeet in winzea and raises. " ^ " $10. <br />i <br />Total number oY Yeet in development is 16 miles, i'~ <br />~ Labor. <br />~ 80. Employed. <br />25 ~aohine Drillmen, $4.00 Yor 8 hour shift. <br />12 bIiners, $3.00 " ' " " " <br />2 Timbermen, $4.00 " " " " <br /> r ' <br />j 2 helpers, $3.00 " " " " <br />10 Tramaers, $3.00 " " " ^ _• ~ , <br />3 Ore Assortere, ~j3,00 " " " " <br /> y°4.00 n <br />• n n n .. <br />2 Topman, y3.b0 " " " " <br />~', 2 Engineers, $4.50 " • <br />i <br /> <br />3 <br />i <br /> <br />Firemen <br /> <br />43.50 <br /> <br />" <br /> <br />" <br /> <br />" <br />~ 2 Blaekamiths, $b.60 & $4,00 Yor 8 hour ahiYt. <br />2 He].pera, $3.60 Yor 8 hour shift. <br />i <br />2 FOTemen, $6.00 " n rr n <br />1 Supterintendent, $14,00 " " <br />1 OYYioo Help, $126.00 por month. <br />1 Cager, $3.60 Yor B hour:• shift. <br />70 ie the avornge number oY he n emp loyed Yor the year; <br />b3 underground and 17 on tho surface. <br />C^st oY Ynel ie $3.75 to $6,00 per ton. Avo. costpor mo. <br />$1600.00. Coat of Timber. $~ Por ?1. hve, per L:o. $200. <br />Coat oY steel, 8-1~2 ~ por lb. dve. por mo. $2b, ~! <br />Cost of oil 3b ~ Por Bal. hve. por mo.' $100. <br />I <br />Coat oY powder $11.60 por ORt. Eve. por mo. $1000.00 <br />i <br />The average value of the rose ie $25.C0. Oost oY mining <br />ore, por ton ,1,14.00. Coat par ton for transporting the <br />ors ie f0 cents by vragon. Cost oY treatment is $7.00 <br />per ton. <br />1 <br />^ <br />