Laserfiche WebLink
srnTisTics: " <br />The average tonnage per month is 3000 tons: <br />IIo. ft. in ahafta is 450, Coat per foot, $26.00 <br />'° " drifts or levelsis 2000, Coat per foot,$4, <br />n n " WiIIZea Or Taieee, 400, n n n <br />$4. '. <br />j Total IIo,-Ft. in developemnt 2850. <br />Zabor. <br />IIo. Employed. ~. <br />3 luinera, y3.00 for 8 hour shift. <br />2 Trar.mera, $3,00 " „ „ <br />.. <br />1 Assayer, $200.00 per month. <br />1 Enginoer, $4.50 for 8 hour shift, <br />l Supterintendent, b175.00 per month. <br />6 iallmen, $3,00 for 8 hoar onift, <br />9 <br />'. Cost, <br />'Coal $5,75 per tou, /,ve. Cost por mo. $175 .CO <br />'Povrder $13.C0 per errt. " " n $198,00 <br />,The avc~rare a say vhlue of tho ore per ton is 0 ~ <br />y2.5 <br />The ao at per ton for mining the ore is 40 oenta, <br />n rr <br />" tronting the ore is 70 cents, <br />