Laserfiche WebLink
<br />III. Comments - Compliance <br />Below are particular issues with regard to any of the compliance items. <br />Enforcement actions resulting from failure to comply with the Act, Rules <br />and Regulations, and the permit also are identified below. <br />1, Hydrologic monitoring records were examined. No data was <br />collected during the winter quarter. The most recent samples <br />(June 6, 1983) were in the iab being analyzed, and the field data <br />was at the office. Results will be sent to the Division. <br />2. A new scale is being installed adjacent to the tipple. <br />3. There has been another slide from the highwall to the portal <br />bench. There is no environmental damage evident from the slide, <br />but the material should be removed if it presents a safety hazard. <br /> <br />