Laserfiche WebLink
COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />A partial inspection of the Apex No. 2 Mine was conducted by <br />Christine Johnston of the Division. At the time of the inspection <br />it was cloudy and cool and there was about 4-5 inches of snow on <br />the ground. The snow prevented a detailed inspection. <br />ROADS <br />The reclaimed portal access road was inspected. A berm has been <br />placed where the portal access road crosses the county road at the <br />south end of the site. The berm prevents access to the reclaimed . <br />road but this area should be regraded further. There has been a <br />rockslide which has deposited the material on this road. It <br />appears that the rockslide appeared some time ago. <br />HYDROLOGIC BALANCE <br />The pond did not hold any water at the time of the inspection. The <br />spillway was inspected and found to be clear. The dip section in <br />the county road is clear and functioning. The dip is also well <br />marked by signs in both directions on the county road. The geoweb <br />material which has been placed in the drainage upstream of the dip <br />section appears to continue to be stable. <br />No problems requiring immediate attention were identified. <br />