Laserfiche WebLink
(Page 3) <br />MINE ID # OR PROSPECTING ID #: M-1999-n77 <br />INSPECTION DATE: to/if/m <br />INSPECTOR'S INITIALS: KAP <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible violations <br />should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation Board. The <br />inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. Information received through citizen complaints and from the operator's consultant indicate that 12 / 19 /01 <br />groundwater levels clowngradient of the Stegner Farms Pit have dropped and levels upgradient have <br />risen since installation of a slurry wall at the site. This is a concern because tlfe operator is required <br />under the permit to minimize disturbances to the prevailing hydrologic balance of the affected land and <br />of the surrounding area both during and after the mining operation and during reclamation. <br />Additionally, areas outside of the affected land shall be protected from slides or damage occurring <br />during the mining operation and reclamation. <br />PB or PV: ~~ <br />TOPIC(S): F"IR <br />Corrective Action: Submit a permit modification. within 30 days of receipt of this insp tgc ion rP,l 07 rt. to <br />fI1P DMG SpPCIfV^nP Whaf dCfIOnG WIII hP id ken f0 Plffl r dPIInPdIP fhP Br aI P%fPn} Of IhP Bff f'fG fhP SnrrV <br />wall is having on groundwater in the vicinity of the Stegner Farms site or to mitieate the effects on <br />groundwater. Measures soecified in the document must he implemented within 60 days of DMG <br />aTmroval of the modification. <br />