Laserfiche WebLink
IV. ENFORCEMENT ACTIONS <br />The following identifies enforcement actions taken during this inspection, the required abatement and <br />date of abatement for the violation, previous violations still requiring abatement and the termination of <br />violations cited during previous inspections. <br />NOV CV-2003-005 was issued on June 17, 2003 for failure to comply with permit conditions. <br />Topsoil redistribution and seeding was not conducted according to reclamation schedule and <br />established timeframes for several locations at the Seneca II Mine site. The Division assessed the <br />proposed civil penalty for this violation on July 7, 2003. On September 3, 2003, the Division <br />received payment for the civil penalty. NOV CV-2003-005 has not been terminated, abatement <br />steps and mitigation measures for this violation aze in progress at the site. All abatement steps as <br />listed on page 3 of the NOV shall be completed no later than September 15, 2003. <br />No enforcement actions were taken as a result of this inspection. <br />NOTE: Attach appropriate VIOLATIONS or CESSATION ORDER CODING FORMS <br />Revised 2/97 <br />