Laserfiche WebLink
III. COMMENTS -COMPLIANCE -continued <br />Williams Fork River -The operator has completed installation of rock jetties along the west side of the river in <br />accordance with TR-3. Willows have been planted along the bank. Only minimal ground surface was <br />disturbed in the staging area and that area has been seeded. <br />PROCESSING WASTE: No activity, no change. <br />SUPPORT FACILITIES: No problems were found in any of the facilities areas. <br />TOPSOIL: Stockpiles were well-vegetated, were not Bullied, and were properly marked. <br />SLIDES AND DAMAGE: None. <br />SUBSIDENCE: No new subsidence is evident. <br />EXCESS SPOIL AND DEVELOPMENT WASTE: No new addition. Existing areas appear stable. <br />RECLAMATION SUCCESS: Reclaimed areas look good. <br />Page 4 of 9 <br />