Laserfiche WebLink
IN~p <br />s(Page.4) <br />.Dye <br />MINE ID # OR PROSPECTING ID # M-1992-045 <br />INSPECTION DATE 09/27/04 INSPECTOR'S INITIALS SSC <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />Corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROSLSMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTION3 <br />1. PROBLEM: <br />The permit boundary markers installed by the operator do not <br />_ reflect the approve permit area of 3 acres in_size._. _ _ <br />CORRECTIVE ACTION: <br />Amend the 110(2) permit application to properly reflect the <br />permit area of 3.8 acres. Currently, the markers delineate the <br />permit area to be 3.8 acres rather than the approved 3.0 acres. <br />Such amendment must be received by the Division on or before <br />November 30, 2004. <br />PROBLEM: <br />The reclamation plan does not address reclamation of the <br />maintenance building. <br />CORRECTIVE ACTION: <br />Address the reclamation of the maintenance building in the <br />amendment application so that the Division can calculate a cost <br />to remove the structure. If the building is to remain as a <br />component of the poatmining land use,(kthen ~~ oval mus e <br />documented by the local land use authority by November 30, 2004. <br />~~-----_ --Y_._. --~ - <br />PROBLEMc - <br />The mining and reclamation plan does not address the waste pile <br />created by the operator. <br />CORRECTIVE ACTION: <br />Address the creation and reclamation of the waste pile noted on <br />site. If the pile is to remain in place, the operator will need to <br />address reclamation of the cut elope in the channel to ultimately <br />achieve a 3h:ly slope. If this issue is not addressed by the <br />operator, then the Division will revise the reclamation cost <br />estimate to move the pile back to the cut slopes to achieve a 3h:1v <br />slope as so noted in the reclamation plan. This should be <br />submitted with item #1 noted above. <br />PROBLEM: <br />The operator is utilizing water in the creek for the mining <br />operation, but has not submitted the appropriate documentation <br />to the Division. <br />CORRECTIVE ACTION: <br />Demonstrate that the operatoz is in compliance with the permit <br />and applicable Colorado Water Laws regarding the use and <br />exposure of water in the Cashe Creek by November 30, 2004. <br />DATE <br />PB Or PV:PB <br />_TOPIC (S):MP <br />21/30/04 <br />PB or PV:PB <br />TOPIC(S):SF <br />11/30/04 <br />PB or PV:PB <br />TOPIC(S) :P-7 <br />11/30/04 <br />PB or PV:PH <br />TOPIC (S):HB <br />11/30/04 <br />