Laserfiche WebLink
tit~ert a~b ~~~otiate~ <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD RP•.PORT <br />PROJECT NUMHP•.R M94105MT <br />PROJECT NAME Gob Pile (West E.Lk) <br />PROJECT LOCATION Somerset, Colorado <br />CLIENT Mountain Coal Company <br />CONTRACTOR Mountain Coal Company <br />DATF.Monday 8-8-94 <br />TECHNICIAN D. Hayes <br />WEATHER CONDITIONS Overcast <br />WORK REQUESTED Density tests <br />FOREMAN Mr, Henry Barbe <br />WORK PERFORMED'HY LAMBERT AND ASSOCIATES REPRESENTATIVE (AND REMARKS) <br />I arrived at the project site at 10:45 A.M, as requested by <br />Mr. Henry Barbe. I performed soii density tests as requested by <br />Mr. Barbe on material being placed on the lower refuse pile, using <br />nuclear soil density test methods. Please refer to the test results <br />sheets for approximate test .locations and test results. The test <br />locations were determined by Mr. Barbe. The test results indicate <br />only the relative compaction and soil moisture content of the material <br />tested at the elevation and location tested at the time of our site <br />visit. <br />P. O. B0%9880 P, O. 80%0045 214 0000 DR. <br />ORAHD Jt1NCTION, 0001602 MOMROSF,CO 8t402 OIJMHOO,CO 01901 <br />rrrm s•cwrnw room ~ea~,Fe room oca coot <br />