My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC46061
DRMS
>
Back File Migration
>
Inspection
>
INSPEC46061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:48:58 PM
Creation date
11/18/2007 11:44:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Inspection
Doc Name
DMG MINERALS PROGRAM INSPECTION REPORT
Inspection Date
6/28/1995
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br />.i <br />(Page 2) <br />MINE ID # OR PROSPECTING ID # M-BO-244 <br />ZNSPECTION DATE June 28. 1995 INSPECTOR'S INITIALS TAS <br />OBSERVATIONS <br />1. Screening and hauling of material from the Pad 1 and Pad 2 areas has stopped. All <br />equipment from these areas has been removed. <br />2. The topsoil stockpile located south of the Hunter Process Building was inspected briefly. <br />The topsoil was very dark in color and appeared to have the consistency of peat. The <br />stockpile will be revegetated during the 1995 field season. <br />3. Construction of Cresson Project - Phase 1 area ie anticipated to be completed by July 3, <br />1995. New sections of synthetic liner were being installed. The clay liner beneath ie <br />nearly complete. All the clay necessary for construction of the liner has been deployed. <br />Carlton Tailings material was being used for smoothing of the clay liner. <br />4. Drain material (filter gravel) was used to build a dike across the drainage toward Arequa <br />Gulch. This portion of the synthetic liner had previously been affected by an intense <br />thunderstorm when stormwater flowed beneath the synthetic liner. <br />5. Gundle crews were cutting and patching the synthetic liner upgradient of the filter <br />gravel dike. <br />6. No ore was loaded on the completed portion of the pad during the inspection. <br />7. No concerns were noted during the inspection. <br />I & E Contact Address <br />NAME John Hardaway <br />OPERATOR Crioole Creek fi Victor Gold <br />STREET P.O. Box 191 <br />CITY/STATE/ZIP Victor. CO 80860 <br />cc: Jim Stevens, DMG <br />^ CE <br />^ BL <br />^ FS <br />^ HW <br />^ HMWMD (CH) <br />^ SE <br />^ WQCD (CH) <br />cc: Berhan Reffelew, DMG <br />Colorado Health Dept. <br />
The URL can be used to link to this page
Your browser does not support the video tag.