Laserfiche WebLink
As part of the approved reclamation plan, an eight-foot diameter culvert is located in the <br />permanent diversion channel south of the shop location. This culvert is approved to remain <br />and a previous written findings as part of Surety Release No. 2 (SL-02) addressed this <br />culvert under the criteria for Phase I bond release (April 7. 1995, revised May 16. 1995). <br />