Laserfiche WebLink
(Page 2) <br />MINE ID # OR PROSPECTING ID #: na-~nm-m ~ <br />INSPECTION DATE: -114/n5m~ INSPECTOR=S INITIALS: _59.5- <br />1. Apre-operation inspection of the proposed Bullish Pit #2 was made. Present during the inspection was Darren <br />Gebhardt of McAfee Construction Company. Digital photographs were taken and are attached to this report. <br />2. The proposed Bullish Pit #2 will be permitted for a total of 40.32 acres and will encompass the existing Special 111 <br />Operation, Permit M2004-070. This inspector notes there is approximately 1.0 acre of historic mining disturbance <br />immediately south of the proposed permit area. The mine plan specifies conventional dry-mining excavation techniques. <br />The site will be reclaimed to rangeland. <br />3. The following permanent man-made structures were noted at the site, and on Exhibit D -Mine Plan Map: <br />• North Sterling Inlet Canal -approximately 100 linear feet west of the western permit boundary <br />• Kinder Morgan High Pressure Gas Line -approximately 200 linear feet of pipeline, approximately 185 <br />linear feet from the southern permit boundary <br />4. There was no evidence of noxious weeds present. <br />I & E Contact Address <br />NAME: William G Lauer <br />OPERATOR: McAfee Construction Co. <br />STREET: P.(). Box 190A <br />CIfY/STATE/ZIP: Starling, CO Rn751 <br />cc: Carl Mount, DMG (via E-Mail) <br />Attachment <br />