Laserfiche WebLink
<br />i <br />III. problems, 7ecommendat_ons and Comoliarce Cates <br />The operator is advised t.'zat the foZ_'owing problems have been idert`:ied durino t`:e inspection <br />and that `allure to correct tYe problems may result in the Civ'_sion taking an £,lFORC_9E71T dCTIG!! <br />pursuant to C.RS 1973, as amended, 34-33-1Z3. (Recommendations and ccmpliance dates are co be <br />clearly noted. Dates are to be specif_°c, e.g., January 3Z, 1981 and :uiderlinedl <br />1. A plan for minimizing the impact of the small coal storage area near the truck <br />scales must be submitted with the current application For a permit under review. The <br />date of compliance will be set by the person in charge of the review process. No <br />date set. <br />2. The design of the spillway structures will be reviewed in the permit process and <br />if any modifications are necessary, action will be taken at that time. No date set. <br />3. The overburden material on topsoil stockpile B must be removed and the top of <br />the pile must be protected From traffic from the nearby road. 7'he Division suggests <br />either a topsoil marker directly in the path or a fence or berm be placed to stop any <br />vehicular traffic on the stockpile. The damage must be repaired and preventative <br />measures taken by June 30, 1981. <br />