Laserfiche WebLink
1 <br />III. Comments - Compliance <br />Below are comments on the inspection. The comments include discussion of <br />observations made during the inspection. Comments also describe any <br />enforcement actions taken during the inspection and the facts or evidence <br />supporting the enforcement action. <br />On March 20 and 22 an inspection was conducted at the Fruits Mine. A <br />facility representative was not present during the inspection. This <br />inspection was conducted by Randy Price of MLRD. An inspection was <br />attempted March 20 but rain and snow prevented driving on the access <br />road to the portal bench. <br />On March 22 the inspection was continued. The weather was clear but <br />there was about 3-4 inches of snow on the ground.Driving was possible <br />to the portal bench. During last months bond release inspection there <br />was some concern expressed by Alfred Hoyl that the junction of the <br />access road with the portal bench was too narrow for cars to pass. A <br />video tape was made of this area with the truck used for scale. Even <br />with snow cover this inspec tor did not have a problem with accessing <br />the bench. <br />