Laserfiche WebLink
~ •.. <br /> <br />ZV. Status o' ?roblem ~esolution <br />T`.e `o1_'owira _tems ccncert crooLems identi:ied at orevious _:soeccion. Problens are class:='ed <br />iato t'v-ee cateaor'_es. these are: I1) problems resolved; (2) resolut'on still in prccess; and <br />(3) operator deli:quert. The date *_hat tce problem is resolved or ehe date t:.ac t::e operator <br />is deemed deZincuenc is to be clearly stated. <br />PROBLEMS RESOLVED <br />82-12 Straw bales were placed below drill pad. <br />82-Z3 Water quality analyses from the pond discharge were provided. <br />82-6 Refuse disposal road culvert was repaired. <br />82-7 Road drainage ditch along road north of the sediment pond was regraded. <br />82-8 Ditch graded over to provide access to the new piezometer was reestablished. <br />82-10 East diversion ditch was cleaned. <br />RESOLUTION IN PROGRESS <br />82-11 Seed the drill pad below power lines by Octot~r I5, 1982. <br />END OF REPORT <br />