Laserfiche WebLink
(Page 4) <br />MINE ID / OR PROSPECTING ID / M-76-070 <br />INSPECTION DATE 2 95 INSPECTOR'S ].N ITIALS TAS. SS <br />The following problems (PB) and/or possible violations (PV) (and sugg~asted corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered bar the Hined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />The mining plan does not clearly define the maximum June 30, 7.995 <br />depth of excavation in the dredge channel. Without PB or PV PB <br />such a limit there is potential for impacts to the TOPIC(S) FIB, SC <br />hydrologic balance ae well.ae offeite damage. <br />Submit a cross-section with specific elevations which <br />demonstrates the relationship between the maximum depth <br />of excavation in the dredge channel and the top <br />elevation of the low flow channel in the west channel <br />of the Animas River. Define the maximum depth <br />(elevation) to which extraction will occur. Please <br />submit the cross-section and narrative in the form of a <br />technical revision. <br />The mining & reclamation plan does not include any Prior to future <br />provisions for baseline or annual monitoring of the mining <br />dredge channel and Animas River within the affected PB or PV PB <br />area. TOPIC(S) F:R, HB <br />Please commit to the following: <br />Baseline Survey <br />Prior to future mining conduct and submit a <br />longitudinal profile of the Animas River and dredge <br />channel which extends from the north to the south <br />permit boundary. <br />Annual Survey <br />Following mining each year conduct and submit a <br />representative cross section which defines the <br />elevation and configuration of the river channel, dike, <br />dredge channel, and west bank <br />3. The reclamation plan does not clearly define the June 30, 1995 <br />morphology to be acheived during final reclamation of PB or PV PB <br />the dredge channel. ~ TOPIC(S) FtS <br />Please provide a revised reclamation plan for the <br />dredge channel which clearly defines the width, depth, <br />bottom slope, and aide elope configuration to be <br />achieved during final reclamation. We request that the <br />revised reclamation plan be submitted in the form of a <br />technical revision. <br />