Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was a partial inspection of the Carbon Junction Mine conducted by Tom Gillis of CDMG. No one <br />represented the operator during the field portion of the inspection. The mine site was moderately wet due <br />to rainfall over the past few days, but unpaved roadways were still passable. <br />Roads <br />The routine ditch & culvert maintenance work referenced in the previous inspection still needs to be <br />undertaken in the near future to ensure that the drainage control system continues to function properly. It <br />appears that the operator has done some borrow ditch repair work on the road leading to the North pit. <br />Hvdroloaic Balance <br />Ponds were inspected and found to be functioning properly. Despite significant rainfall during the past few <br />days, the large pond adjacent to the spoil pile was dry. The water level in the smaller pond situated below <br />the access road was about the same as observed during previous inspections. <br />