Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />This was an partial inspection of the Seneca II Mine for the month of January, 1997. The mine <br />has basically stopped the production of coal and has only to haul the exposed coal to the power <br />plant ,then activities to finish the reclamation plan can commence. <br />ROADS: The haul road has been restored and most of the roadside ditches have been re- <br />installed. <br />HYDROLOGIC BALANCE: What little snow that has melted is being carried off the roads and <br />into the sediment ponds as designed. Changes in the location of several stock ponds were <br />discussed and the plan appears to be acceptable. When complete, the plan should be submitted <br />as a technical revision. <br />