Laserfiche WebLink
<br />(Page 3) <br /> <br />MINE ID # OR PROSPECTING ID # M-77-193 <br />INSPECTION DATE 10/20/95 INSPECTOR'S INITIALS TAS <br />The following problems (PB) and/or possible violations (PV) (and eug~3eeted corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered key the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be~ notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />1. There were no definitive collection ditches along the <br />haul road to convey stormwater runoff. <br />CORRECTION <br />DATE <br />December 1, <br />1996 <br />PB or PV PH <br />TOPIC(S) RD, HB <br />Install temporary collection ditches along the haul <br />road, wherever feasible, for management of stormwater <br />runoff and maintain until the permanent riprapped <br />channels as described in the stormwater management plan <br />are installed. <br />2 <br />3. <br />PB or PV <br />TOPIC(S) <br />PB or PV <br />TOPIC(S) <br />