My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC45202
DRMS
>
Back File Migration
>
Inspection
>
INSPEC45202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:48:15 PM
Creation date
11/18/2007 11:40:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Inspection
Doc Date
1/23/1995
Doc Name
INSPECTION PB AND CORRECTIVE ACTION PN M-73-021
From
CAMAS AMERICA INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAMAS America, Inc. • <br />;- <br />r III IIIIIIIIIIIII III <br />'.iupport Services Group-Denver Region <br />3609 South Wadsworth Boulevard Suite 300 Lakewood Colorado 80235 <br />Telephone (303) 980-2424 Facsimile (303) 980-8002 <br />January 20, 1995 <br />DECEIVED <br />JAN 2 3 1995 <br />Divisl, . of Mrnerais ~, Geolo9Y <br />Mr. Cazl Mount <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street, Room #215 <br />Denver, CO 80203 <br />Re: Inspection PB and Corrective Action, Permit # M-73-021 <br />Dear Mr. Mount: <br />CAMAS <br />As per the Division's request, we have taken the corrective action measures [o salvage the top <br />soil that was inadvertently covered in the south-central quarry. Enclosed is a before picture, two <br />remediation pictures, and two completed project pictures that should serve as documentation of <br />the corrective actions taken by the plant manager at the Morrison Quarry. Please note the new <br />topsoil stockpile in the photos. We have recently started the remediation of the east highwalls <br />and this topsoil will be placed on the first benches within the next few months. <br />~, . <br />In order to prevent any future burial of topsoil, we have placed a green construction barrier fence <br />between the haul road and the immediate gulch to the south (see photo). This should insure that <br />no activity will take place on the virgin ground until stripping activities are necessary. At that <br />time proper topsoil savage techniques will be implemented. <br />On behalf of Cooley Gravel Company, we [hank you for your consideration in this matter <br />incerely, <br />Michael C. Ref~,i <br />Support Services <br />cc: Rick Mergens, Vice-President and General Manager -Cooley Gravel Company <br />Norm Jagger, Operations Manager -Cooley Gravel Company <br />Steve Shulte, Plant Manager - CGC Morrison Quarry <br />Morrison Quarry file <br />MCR h\xy60ascgcMgrrypb dot <br />Bituminous Roadways Cooley Gravel Company Flanagan Readp Mia limired <br />Lakewood Colorado Lakewood Colorado Denver Colorado <br />
The URL can be used to link to this page
Your browser does not support the video tag.