My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC45183
DRMS
>
Back File Migration
>
Inspection
>
INSPEC45183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:48:14 PM
Creation date
11/18/2007 11:40:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Inspection
Doc Date
7/31/2001
Doc Name
OSM MINE SITE EVALUATION STATE PROGRAM
Inspection Date
7/11/2001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
°' ~ U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />PermitteeJ NATIONAL KING COAL Permit C-035-81 Field Visit 07/11/2001 Continuation Page <br />Person Number Date <br />28. <br />~, 3=Not <br />B. <br />C. <br />1. _ Mining within Valid Permit <br />2. _ Mining within Bonded Area <br />3. ~ Terms & Conditions of Permit <br />4. _ Liability Insurance <br />5. _ Ownership and Control <br />6. _ Temporary Cessation <br />7. _ AML Rec. Fees -- Non-Respondent <br />8. _ AML Rec. Fees -- Failure to Pay <br />Hydrologic Balance <br />1._ Drainage Control <br />2._ Inspections & Certifications <br />3._ Siltation Structures <br />4._ Dischazge Structures <br />5._ Diversions <br />6._ Effluent Limits <br />7._ Ground Water Monitoring <br />8._ Surface Water Monitoring <br />9._ Drainage -- Acid-Toxic Materials <br />10._ Impoundments <br />11._ Sveam Buffer Zones <br />Topsoil & Subsoil <br />1._ Removal <br />2._ Substitute Materials <br />3.~ Storage and Protection <br />rerrormance Sranaara t;aregories <br />Planned, 4=Not Started, S=Noncompliance Identified E sewhere, 6=Previously Cited <br />D. Backfrlling 8 Grading H. <br />Subsidence Control Plan <br />I ._ Exposed Openings _ <br />I. Roads <br />2 ._ Contemporaneous Reclamation 1. <br />Road Construction <br />3 ._ Approximate Original Contour _ <br />2. <br />Certification <br />4 ._ Highwall Elimination _ <br />3._ Drainage <br />5. _ Steep Slopes (includes downslope) q,_ Surfacing and Maintenance <br />6 ._ Handling of Acid & Toxic Materials 5. Reclamation <br />7 ._ Stabilization (rills and gullies) J, Signs & Markers <br />E. Excess Spoil Disposal 1._ Signs <br />1 ._ Placement 2. <br />Markers <br />2. _ Drainage Conuol _ <br />1{. 1 Distance Prohibitions <br />3. _ Surface Stabilization <br />L. Revegetation <br />4. _ Inspections & Certifications l._ Vegetative Cover <br />F. C oal Mine Waste 2. <br />Timing <br /> (Refuse Piles/Impoundments) _ <br />M. <br />Postmining Land Use <br />1. _ Drainage Control _ <br />2. Surface Stabilization N. Other <br />3. Placement General <br />4. _ Inspections and Certifications Perlormanee <br />5. _ Impounding Structures Category <br />G. Use OC Explosives ~ ~ 1) special focus, landowner <br />1. _ Blaster Certification <br />2. _ Distance Prohibitions 2) <br />3. _ Blast Survey/Schedule _ <br />4. Warnings & Records 3) <br />5. _ Control of Adverse Effects _ <br /> Performance Standard Categories <br /> 30 CFR Counterpart <br />A. Administrative ......................................................................... <br />1. Valid Permit ........................................................................... ..........773.11 <br />2. Mining within Bonded Area ...................................... ..........773.11 <br />3 . Terms Q Conditions of Permit ................................... ..........773.17 <br />4. Liability Insurance ...................................................... ..........800.60 <br />5. Ownership and Conuol ............................................... .........778.13 <br />6. Temporary Cessation ..............................842.11 (e) & S16J617.131 <br />7. A Rec. Fees --Non-Respondent ........................... .....870.15(b) <br />8. AML Rec. Fees -- Failure to Pay ................................ .....870.15(a) <br />E. Excess Spoil Disposal ........................................... (816/817.71-74) <br />1. Placement ....................................................................... ....................71(e) <br />2. Drainage Convol ........................................................... .................... 71(f) <br />3. SurfaceStabilization ...................................................... .....................71(g) <br />4. Inspections & Cenifications ........................................... ....................71(h) <br />F. Coal Mine Waste (Refuse Piles/Impoundments) ,,,,,(g16/817.81-84) <br />1. Drainage Conuol ................................................ ...............................63(a) <br />2. Surface Stabilize[ion ..................:......................... ..............................83(b) <br />3. Placement ............................................................. ..............................83(c) <br />4. Inspections and Certifications .............................. .............................83(d) <br />5. Impounding Structures ......................................... ..................................84 <br />B. Hydrologic Balance ......................................(816/817.41-57) <br />G. Use of Explosives ..................................................(816/817.61-68) <br />]. Drainage Convol ............................................. ............................45 <br />2. Inspections &Certifications ........................... ..................49(a)(10) <br />3. Siltation Swctures ......................................... ............................ 46 <br />4. Discharge Structures ...................................... .............................47 <br />5. Diversions ....................................................... ............................43 <br />6. Effluent Lintits ................................................ ............................42 <br />7. Ground Water Monitoring .............................. ........................41(c) <br />8. Surface Water Monitoring .............................. ........................41(e) <br />9. Drainage--Acid-Toxic Materials .................. .........................41(f) <br />10. Impoundments ................................................ ............................49 <br />11. Sveam Suffer Zones ...................................... .............................57 <br />C. Topsoil &Subsoil ...............................................(816/817.22) <br />1 . Removal ....................................................... ...........................22(a) <br />2. Substitute Materiels ...................................... ...........................22(c) <br />3. Storage and Protection .................................. ...........................22(c) <br />4 . Redistribu[ion ............................................... ...........................22(d) <br />D. Backtilling & Grading ......................... .....(816/817.95-107) <br />1. Exposed Openings .....................816/817.13, 14, 15, & 823.11 & 21 <br />2. Contemporaneous Reclamalion ..................... .............................100 <br />3. Approximate Original Contour ...................... ....................102(a)(I) <br />4. Highwall Elimination ..................................... ....................102(a)(2) <br />5. Steep Slopes (includes downslope) ................ ............................107 <br />6. Handling of Acid Q Toxic Materials ............. .........................102(c) <br />7. Stabilization (rills and gullies) ....................... ...........................95(b) <br />1. Blaster Certificadon .......................................... .................................61(c) <br />2. Distance Prohibitions ....................................... ..................................61(d) <br />3. Blast Survev/Schedule ...................................... .................................62-64 <br />4. Warnings Bc Records ........................................ ..............................66 & 68 <br />5. Control of Adverse Effects ............................... ......................................67 <br />H. Subsidence Control Plan .........................................(817.121-122) <br />I. Roads .................................................................(816/817.150.151) <br />1. <br />2. <br />3. <br />4. <br />S. <br />J. <br />IC. <br />L. <br />1. <br />2. <br />M. <br />Page 2 of <br />Road GonSWC[ion ...........................................................................I50(c) <br />Cenification ...................................................................................... I51(a) <br />Drainage ...............................................................................150(b)-151(d) <br />Surfacing and Maintenance ..................................................1501e)- I51(d) <br />Reclamation ...................................................................................... I50(F) <br />Signs & Markers <br />(816/817.11) <br />Signs ................................... ..................................................11(a),(b).8t(c) <br />Markers ............................... .......................................1 ] (a),(b).(d).(e).&(F) <br />Distance Prohibitions .. .....................................................(761.11) <br />Revegetation ................. ....................................(816/817.111.116) <br />Vegetative Cover ................ .......................................................1 ] 1 & 1 ] 6 <br />Timing ................................ ..................................................................113 <br />Postmining Land Use .. ............................................(816/817.133) <br />
The URL can be used to link to this page
Your browser does not support the video tag.