My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC45174
DRMS
>
Back File Migration
>
Inspection
>
INSPEC45174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:48:14 PM
Creation date
11/18/2007 11:40:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995097
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DMG
To
Wright & Preusch Mining Ltd
Inspection Date
10/29/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task # : 026 State :Colorado <br />Date : 12/052002 County :Pitkin <br />User: SSS Site :SmugglerMine <br />Permit/job# : M-1995-097 <br />Abbreviation :none <br />Filename :M097-026 <br />Agency or organization name : DMG <br />Permit or other job action :Routine Reclamation Cost Estimate Update <br />Task description :Place 4 feet of cover material overjunk disposed of in main bench pit <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D8R - SSU Horsepower : 305 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br /> Cost Breakdown : Ownership cosUhour : $49.50 NA <br /> Operating cosUhour : $65.98 100 <br /> Ripper op.cosUhour : $1.50 20 <br /> Operator cosUhour : $27.99 NA <br /> Total unit cosUhour : $144.97 Total fleet cosUhour : $144,97 <br /> <br />MATERIAL QUANTITIES <br />Initial Swett Loose <br />volume : 1,185 LCY factor : NA volume : 1,185 LCY <br />Source of estimated volume :As: <br />Source of estimated swell factor : NA <br />r--- --- ---_._.- - ~-- ---- --- --- <br />'HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,400.0 LCY/hr <br />Material wnsistency description <br />Padlv consolidated stockpile <br />100'x 80'x 4'cover <br />Average push gradient : 0.00 <br />Average site altitude : 8,075 fey <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Earth -Dry packed Adjusted unit production <br />Adjusted fleet production <br />- - - - _ - <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time <br />Unit cost : $0.210 /LCY Total job cost <br />'- - - - - <br />0.75 <br />1.10 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />1.00 <br />1.00 <br />0.90 <br />1.00 <br />691.48 <br />691.48 <br />1.71 <br />$248 <br />Source <br />LCY/hr <br />Lcvmr <br />Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.