Laserfiche WebLink
l <br />CIRCES Cost Estimating Softwa <br />TRUCKING -ONLY WORK <br />PROJECT IDENTIFICATION <br />Agency or organisation name :OMG <br />Task#: 04a State:CO/omdo PermNob#:M-1995.091 <br />Date: 171Po5/2002 Caunry:Pifkin Abbreviation :none <br />User : SSS Site :Smuggler Mine Filename : M097-04a <br />Permit or other job action :Routine Reclamation Cost Estimate Uptlate <br />Task descnpdon :Purchase and impoR growth medium <br />HOURLY EQUIPMENT COST <br />Model:Genenc 8-10 cy, 6x4 Shift basis: spar tlay <br />Cost Breakdown : Job uBlization % Horsepower: 235 <br />Ownership Wst/hour: $12.57 NA <br />Operating coSMour: $17.77 95 Weight{UST): 9.00 <br />Operator cesUhour : $23.61 NA Cost data source : (CRG) <br />Total unit C051/hour: $53.95 Total Beet cost/hour: $181.88 <br />MATERIAL QUANTITIES <br />Initlal Swell Loose <br />volume: 1,694 LCY factor: NA volume: 1,894 LCY <br />Source of quantity take-0ff :2.1 acres covered with 6 inches of growth medium <br />Source of estimated swell tactor:NA <br />Material purchase cost: $6.00 /lCY Total cost: $10,184 <br />r- __ <br />L __ __ _.-..-_ __ .____._-_ - _ - __ ___ _ .. ___ ___ ._ . ! <br />HOURLY PRODUG710N <br />Hauling Caoacily' <br />Material weight: 2,700 pountls/LCY Stmdk volume: 8.00 LGY <br />Materal descriptlon : Heaped volume : 70.00 LCY <br />EaRh-Loam Average volume: 9.00 LCY <br />Rated paNoad: 22.000 pounds <br />Payload capacity: 10.48 LCY <br />Adjusted volume: 9.00 LCY <br /> Source <br />Track Cvde Tme' Exchange 6me (min.) : 0.50 (Cat HB) <br /> Load time (min.) : 1.00 (Cat HB) <br />7.00 mile haul trip at: 35.0 mph (avg.) = Haul time (min.) : 12.00 /mi./mph)x60 <br /> Dump Bme (min.) : 0.80 (Cat HB) <br />7.00 mile return }dp at: 35.0 mph (avg.) = Relum time (min.) : 12.00 (mi./mph/x60 <br /> <br /> Total cycle Bme : Y8.30 minutes <br />Job Condition Coneclion Factors <br /> <br />Average site altitutle : 8,075 feet dust Hod T k P ucli <br />AlGtutle adjustment factor 0.97 (Cat HB) <br />Job efficiency factor: 0.83 (1 shiR/day) Unadjusted unit production : 20.53 LCV/Hour <br /> Atljustetl unit production : 16.53 LCY/Hour <br />Net joD correction : 0.81 Adjusted fleet production : 49.59 LCYMOUr <br />i~_ - -- _ - ---- - - _ ..~ _ _ _: _ _ <br />JOB CO T <br />Fleet size: 3 Truck(s) Total job time: 34.18 Hours <br />Unit cost: 59.263 /LCY Total job cost: $15,893 <br /> <br />