My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC45110
>
Back File Migration
>
Inspection
>
INSPEC45110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:48:11 PM
Creation date
11/18/2007 11:40:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980038
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DMG
To
Ron Ebberts
Inspection Date
9/12/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~' ~ l: <br />i/«,!~ ~~ <br />4,11° i.' ~~? <br />PROJECT IDENTIFICATION <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />Date : 27-Sep-2002 ,~ Permit or job no.: M-1980-038 ~ Site :Disappointment Valley <br />User : WHE Abbreviation : none State :Colorado <br />Filename : M038-000 County :San Miguel <br />Agency or organization name : OMG <br />Permit or job action :Genera! 110c bond review <br />ASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br /> <br />001 -Highwall reduction from 0.5H: f V to 3H:1 V dozer 1 1.8 $261 <br /> <br />002 -Rip & grade 3 acres affected area dozer 1 4.86 $688 <br /> <br />003 -Topsoil replacement 12" depth aver 4 acres dozer 1 12,6 $1,747 <br /> <br />004 -Revegetate 4 acres affected area ravage 1 5.0 $2,707 <br /> <br />005 -Haul reclamation equipment to and from job site -'~ - ~ mobilize 5 6.2 $2, 214 <br /> <br />006 -Remove mist debris, assume 10'L ' 5'W ' 5'H (iil $0.22/cf NA 1 4.0 $55 <br />`includes inflation factor adjustment of <br />INDIRECT.COSTS <br />OVERHEAD AND PROFIT - <br />NA <br />Liability insurance <br />Performance tiond <br />Job superintendent <br />Profit <br />1.55 <br />1.05 <br />NA" <br />10.00 <br />sueroTALS:~ 34.6 <br />TOTAL DIRECT COST - <br />of direct total = $119 <br />of direct total = $81 <br />NA NA total = NA <br />of direct total = $767 <br />`not required (or eqp. operetorsenres as super) TOTAL O 8 P = $967 <br /> CONTRACT AMOUNT (direct+08P)= $8,639 <br />PROJECT MANAGEMENT- <br />Engineeringwork andlor contracVbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of Intr. NA total = $432 <br />CONTINGENCY- NA' NA total = NA <br />'confingencfes accounted for at task level 70TAL INDIRECT COST= $1,399 <br /> TOTAL BOND AMOUNT (direct + indirect) _ $9,071 <br />h ~ ~~'' '~~" j <br />
The URL can be used to link to this page
Your browser does not support the video tag.