Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations <br />made during the inspection. Comments also describe any enforcement actions taken during <br />the inspection and the facts or evidence supporting the enforcement action. <br />Miscellaneous: -The fuel tank that was on the far south side of the facilities area and <br />the concrete containment pad have been removed. There was a truck leaving the <br />site at the time of the inspection with what looked like the last load of concrete (the <br />truck was full of concrete and none remained at the site). The area still needs to <br />have some minor grading work done. <br />-All of the power poles have been removed from the mine site. All of the power lines <br />have been removed from the facilities area. There are still power lines on fhe ground <br />along the haul road to the refuse pile and substation and along the edges of the <br />refuse pile. In a conversation with George Patterson of EFCI on 2 October he <br />indicated that the contractors were in the process of removing the lines. <br />