Laserfiche WebLink
<br />(Page 4) <br /> <br />MINE ID # OR PROSPECTING ID # b-82-020 <br />INSPECTION DATE 5-5-93 INSPECTOR'S INITIALS ACS <br />estimate, he should do eo well in advance of the 60 day deadline. Any increased bonding must <br />be in place by the deadline to avoid a hearing of a possible violation before the Mined Land <br />Reclamation Board. <br />10. The operator has not yet obtained a NPDES storm water discharge permit for this mine <br />site. All operators of privately owned mining operations must apply for such a permit with <br />the Colorado Department of Health, Water Quality Control Division. If, as a result of storm <br />water regulations, the operator ie required to construct any surface run-off control <br />structures, such ae settling ponds, ditches, check dame, culverts, etc., construction of <br />these structures must be incorporated into this operations reclamation permit through a <br />technical revision. <br />I & E Contact Addreee <br />cc: James Stevens, DMG <br />NAME <br />OPERATOR _ <br />STREET <br />CITY/STATE/ZIP <br />