Laserfiche WebLink
Proposed Data Collection Format <br />For the Waste Bank Review <br />(Draft 2/28/97) <br />Mine Operator Inspection Reporting <br />Mine Name <br />Permit No. <br />Waste Bank Identifier <br />Permit Design Reference <br />Reporting <br />Document <br />(Note 1) Report <br />Date <br />(Note 2) <br />Construction Task <br />(Note 3) Construction <br />Period <br />From / To Inspect. <br />Date <br />(Note 4) Inspected <br />By <br />(Note 5) <br />Comments <br /> Site Prepazation <br /> TopsoiUOrganic Removal <br /> Underdrainage Placement (Document with colored photographs) <br /> Surface Drainage Installation <br /> Fill Compaction & Placement <br /> Vegetation Reestablishment <br />Notes: 1) A qualified registered engineer must submit a report to certify that construction is as specified in the design approved by DMG. <br />The report must also describe any hazardous condition observed. [See Rule 4.09. l(11)(b).] <br />2) The certified report must be submitted to DMG within 2 weeks after an inspection [Rule 4.09.1(11)(b)]. <br />3) Rules 4.10.2(2)and 4.09.1(11)(a) require inspections during these construction periods. <br />4) Rule 4.09.1.(11)(a) requires quarterly inspections at a minimum. <br />5) Inspectors must be qualified professionals. See Rule 4.09.1(11)(a). <br />