My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC44509
DRMS
>
Back File Migration
>
Inspection
>
INSPEC44509
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:47:41 PM
Creation date
11/18/2007 11:37:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Inspection
Doc Date
12/18/1996
Doc Name
PROPOSED STRATEGY FOR CONDUCTING THE WASTE-BANKS SPECIAL FOCUS STUDY FOR THE COLO FY1997 OVERSIGHT R
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Questions Pertaining to the Waste Banks Review <br />(2/27/97 draft) <br />• How was the Waste Bank topic selected for the FY 1997 oversight review? <br />• Under the Sample Population section, on page A-8 of the Agreement, it is stated that '"I'he <br />sites were selected based on the size and status of their coal mine waste banks." What was <br />the "size and status" criteria that was used to select sample sites? <br />• Given the Measurement provisions on page A-7 of the Agreement, what specific items will <br />be reviewed and evaluated? How will the information be obtained? The information attached <br />describes the type of information and recording format that could be used during field <br />reviews. <br />• Does DMG anticipate requesting any inspection assistance from the Tech Team?; if so, what <br />inspection duties are anticipated?; if not, what role will the OSM Tech Team have during the <br />field reviews? <br />• For the purposes of this review, what is the de5nition of an off-site impact? How will off-site <br />impacts be determined? How will the significance ofoff--site impacts be evaluated? (Note that <br />in previous team meetings it has been suggested that the term "off-site" refers to any azea <br />outside the "disturbed" area; yet, the way to determine the disturbed azea isn't cleaz. Does <br />DMG have any suggestions on how to identify disturbed azeas?) <br />For each coal-mine-waste site, what permit exhibits must be reviewed? (It is recommended <br />that DMG prepare a list of permit exhibits for reference and identify the specific features that <br />will be evaluated in the field.) <br />What is the schedule for conducting field reviews? Who will be present during the field <br />evaluations? <br />The Tech Team plans to produce a trip report for each mine site, and an overall report that <br />summarizes the review findings. What would be the best way to have the reports reviewed <br />by DMG before they go fmal? <br />Note: It is recommended that the special focus reviews report fmdings based on a single point in <br />time, which would probably be the time of the site visits. No pending permit actions would <br />be considered during Held evaluations, although proposed actions could be part of a solution <br />to any problems identified in the field. <br />
The URL can be used to link to this page
Your browser does not support the video tag.