Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MI-~~~~p <br />Mine Site Evaluation <br />State Program 6VOV 30 2001 <br />iiiiiiiiiiiiiiuiii <br />999 <br />„~. .~~ <br />a <br />y ~) <br />0 2 <br />z <br />/C~OFSURFACF'~` <br />1. Permittee/Person 9. Permit Numbe~vision of Mif18f81S & Geokigyl0. Permit Type <br /> COLORADO YAAIPA COAL CO. C-071-81 PP <br /> 2. Address 11. Field Visit Date 12. Pu ose 13. SRA Present <br /> 29515 ROUTT COUNTY RD #27 11/02/2001 OBR ^Y <br />3. City 4. State mm - dd - yyyy <br /> 14. Permit Status 15. Site Stahls 16. Facility Type <br />OAK CREEK CO <br />BR P2 A~ <br />5. Zip Code 6. Phone Number <br /> 17. OSM Office # 18. CCID # 19. Land Code <br />80467 (970)870-2712 <br />140 F <br />7. Operator Name; if Different than Permittee <br /> Z0. M.S.H.A ID # 21. State Abrev. 22. County Name <br /> O ROUT'T <br /> OS-0271C C <br />8. Mine Name <br /> 23. AVS Permittee Entity ID Number 24. State Office <br />ECKMAN PARK/11~NE 1& <br /> 056921 <br />25. Hours 26. Sign. ure Black 27. Reviewing Official: <br />2.0 a. Permit Review ~ <br /> <br />Si e: 11~Qo~of - <br />Signature: <br />0 b. Site Visit Time <br />g <br />, HENRY AUSTIN ID # 116 <br /> <br />Travel Time <br />c Review Date: I f / ? 6/ G / <br />g-0 <br />. Printed Name: mm - dd - yyyy <br />2.0 d. Report Writing Date: ] 1/20/2001 Is Supplemental MSE Page Used Y/N Y^ <br />Permit Type -Item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR ...Citizen Complaint Referral (non site visit) <br />pxx ..Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axz.... Assistance Fxx..... Federal Actions CCF.... Cilizen Complaint Follow-up <br />Joint Inspection -Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 14 AB.... Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as tlefned in <br />.A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(8) <br />permitted but not yet disturbed. AB1.. good Forfeiture: Bond forfeiture offcially in process or completed, and. <br />IN....Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Ir~terim Program Permit) Ag2 .Partially Reclaimed Forfeiture: Forfeited site where all bonds have keen <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR.. good Release: Reclamation completed and State Regulatory AB3..Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA.. Not Applicable: When site is unpermitted. <br />Site Status Codes - Item ~ 5 NS .Non-Site Visit: Status of site not determined. <br />ND...NO Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The RA is pursuing <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX.. Coal Exploration: Coal exploration operations TC..Temporary Cessation: The RA has granted performance bond(s), and/or reclama- <br />have started and where coal mining operations cessation of mining pursuant to 30 CFR 8161 lion of forfeited site is in progress. <br />have not begun. 817.131(b). FR .Forfeited and Reclaimed: Forfeiture <br />I b <br />l <br />l <br />ti <br />l <br />t <br />d <br />I R <br />l <br />Ph <br />d <br />P <br />ease rec <br />ama <br />on comp <br />e <br />e <br />. <br />elease: At <br />east <br />ase <br />on <br />re <br />hase <br />AP.. Active Coal Producing: Coal suface mining P1... <br />activities are occurring. granted for entire permitted area. For interim FO Abandoned Site: Abandoned site that <br />qN.. Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond. <br />facility such as tipple or preparation plant P2. Phase II Release At least Phase II bond release WC..`A'ildcat: Coal mining and reclamation <br />r <br />ti <br />h <br />r <br />ki <br />l <br />d <br />f <br />h <br />i <br />i <br />t <br />d <br />area. opera <br />ons <br />ave o <br />are <br />a <br />ng p <br />ace an <br />or t <br />e ent <br />re perm <br />t <br />e <br />NM..No Mining The Permit Status is active, site is <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not covered byy the <br />mining activit , antl site not regraded. the RA has released all bond required permits from the RA. <br />Facility Type Codes -Item 18 D...Ancillary (Haulroad, Conveyor, and/or Rails) H...Exploration Permits L... Remining site permitted <br />A... Surface E.. Refuse andlor Impoundment I... Notice of Intent to Explore under 30 CFR785 25 <br />B... Underground F... Loading Facility and/or Tipple J... Exemp116 and Z3 <br />C... Preparation Plant G... Stockpiles N...Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Smal] Business and Apiculture Regulatory Enforcement Ombudsman and 10 Regional Fauness Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each aeene 's <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including those of af5liates) page l of <br />and wish fo comment on the enforcement or compliance activities of OSM, call 1-RRR-REG-FAIR (1-RRR-734-3247). ar.~..e o«~ev a, i9sx <br />