Laserfiche WebLink
<br />Richard D. Lamm <br />Governor <br /> <br /> <br />DEPARTMENT OF NATURAL RESOURCES <br />David H. Getcnes. Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C:SH ELTON, Director <br />COAL INSPECTION REPORT <br />Operation: <br />File No.: <br />Operator Name: <br />Permittee Name <br />Address: <br />County: <br />Inspection Date: <br />Type of Operation: <br />Inspector: <br />Weather: <br />Time: <br />Type of Inspection <br />Operator Contact: <br />Red Canyon Mine III IIIIIIIIIIIIIIII <br />C-034-81 <br />Grand Mesa Coal Company <br />Same <br />P.O. Box 226 <br />Delta, CO 81416 <br />Delta <br />Nov. 2U, 1984 <br />Underground, Federal <br />Dan Mathews <br />Clear and mild <br />10:00 a.m. <br />Complete <br />None <br />I. General Comments <br />A complete inspection of surface facilities at the mine and loadout was <br />conducted. As a result of temporary cessation status, no operator contact was <br />present. <br />Sediment pond expansion at the mine has been initiated and appeared to have <br />been largely completed. Minor ditch modification and riprapping has not been <br />completed. The sediment pond was not discharging at the time of the <br />inspection. <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />