Laserfiche WebLink
<br />QI. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was a complete inspection of the Hamilton Mine for the month of June, 2001. <br />RECORDS: Records were not inspected but as they have been satisfactorily maintained in the past, the <br />Division will assume they are still in satisfactory condition. <br />ROADS: The section of road along the Area 1 access road of the mine has newly installed waterbars and <br />the road should be far better off due to this installation. All other sections of the road appear stable. <br />HYDROLOGIC BALANCE: All ditches and culverts are clear and capable of functioning as designed. <br />Pond A was dry at the time of the inspection, Pond B had a trace of water in it but was not discharging. <br />Both ponds are capable of functioning as designed <br />RECLAMATION SUCCESS: The site's vegetation is doing outstanding as well as the undisturbed <br />areas but in the next two or three years, it is likely that a phase two bond release could be applied for. <br />