Laserfiche WebLink
COLORADO NIHED LAND RECLAMATION DIVISION <br />AELDIH6 TRUCK COST DATA NORKSHEET ~ Sheet I of 2 sheets REFERENCES: 11 COST REFERENCE GUIDE <br />""""""""""""""""' 21 CONTRACTORS EOUIPHENT COST GUIDE <br />REVISION DATE: 8/91 3) COLORADO CONTRACTORS ASSOCIATION <br />""""""""" WAGE RATE SCHEDULE <br />SIORKSHEET FILENAME: WELDR-TK.HK1 <br />MACHINE DESCRIPTION: On-highway light duty truck, gasoline powered, l ton, <br />conventional cab, dz4, 180 HP, + gas/arc/gen. equip. <br />COST ADJUSTMENT FACTORS BASE VALUE ADJUSTED VALUE <br />Acquisition Cost: 510,637.00 513,794.OL <br />Econooic life Hours: 7000 9000 <br />Annual Use Hours: 2112 2000 <br />Mech. Labor Cost-lone 1: 524.76 521.95 <br />-lone 2: 524.78 521.95 <br />Fue] Cost per gal.: 50.89 50.89 <br />Cube Cost: 50.98 50.98 <br />Tire Life Hours: 2000 1650 <br />lire Purchase Price: 5620.00 5465.93 <br /> ; ; --- BASE OkHEASHIP b OVERHAUL COST S ----;- ---- ---- -------BASE OPERATI116 COSTS --- ----- --- <br />BASIC MODEL 6 ATTACHMENTS ; DESCRIPTION ~ DEPRECIATION OHD/CFC LABOR PARTS LABOR PARTS FUEL LURE TIRES G.E. C. <br />-------------------------- <br />Nachine Model No. ------------------- <br />1 TON 4t4 PICKUP --------------- <br />52.46 ------ <br />SO ----- <br />.EI ---- <br />50. --- <br />32 -------- <br />50.48 ---- <br />50. ---- <br />40 -------- <br />50.41 ---- <br />53. ---- <br />90 ---- <br />51. --- <br />56 -------- <br />50.31 ---- <br />50. --- <br />00 <br />Attach~ent I1 :400a DC Diesel Arc 50.79 20 .40 50. 53 50.70 50. 47 S0.l9 S4. 6R 50. 52 20.06 50. 00 <br />Attach~ent 12 B' Cutting Torch f0.07 50 .02 50. 01 50.01 SO. OI 50.01 50. 00 50. 00 50.00 50. 00 <br />At.tach~ent 13 <br />-------------------------- H/A <br />-------------------- 50.00 <br />--------------- 50. <br />------ 00 <br />----- 50. <br />---- 00 <br />---- 50.00 <br />-------- 50. <br />---- 00 <br />---- 50.00 <br />-------- 50. <br />---- 00 <br />---- 50 <br />--- .00 <br />---- 50.00 <br />-------- 50. <br />----- 00 <br />--- <br />BASE COST SUBTOTALS : f3.32 51 .23 SO. Eri 21.19 50. 88 50.61 18. 58 52. 0° S0.3i 50. 00 <br /> ; I -- AGJUSiED UNNERSHIF 6 OVERHAUL COSTS -;-- ------- -- ADJUSTED nPERATING COSTS --- -------- <br />COST ADJUSTMENT <br />---------------- FACTORS <br />--------- ~ FACTOR <br />----------- VALUE ~ <br />----------- DEPRECIATION <br />----- <br />----- <br />- OHDJCFC <br />----- <br />---- LABOR <br />---- PARTS <br />----- <br />--- LA60R <br />-- <br />-- PARTS <br />--- <br />-- FUEL <br />--- <br />- CUBE <br />-------- TIRES <br />------- G.E.C. <br />-------- <br />Acquisition Cost 0.7401 - <br />- <br />- <br />52.46 - <br />- <br />H/A -- <br />- <br />N/A - <br />- <br />N/A -- <br />N/A -- <br />-- <br />NIA - <br />--- <br />N/A N/A N%A N/A <br />Econo~ic Life 0.7778 51.91 N/A 50.61 50.93 20.62 30.47 H/A NIA N/A NJA <br />Annual Usage 1.0560 52.59 51.30 N/A NJA N/A N/A II,A H/A N/b N/A <br />Double shifts 750depr. -.500ahd 21.'f5 50.65 N/A H/A NJA H/A H;A N/A NjA N;A <br />Triple Shifts .667depr. -.333ohd Sl.i3 50.43 N/A N/A N/A N/A HiA N/A H%A NA <br />Mechanic. Cosl - lone 1 O.EBE•0 N/A H/A 50.59 NjA 50.61 N/A NiA HjA NjA H/A <br />- lone 2 0.8EE•0 N/A N/A 50.59 N/A 50.61 N/A NiA Ilj'A NjA HA <br />Fuel/Cube/Tire Cost Variable NIA NjA tl%A N/A H/A N,/A SE:.58 52.0:? t0.45 50.00 <br />Truck Uti;. - tone 1 100.001 N7A NjA 50.59 f0.93 20.61 50.47 58.58 52.08 50.45 50.00 <br /> <br />- ------------- - lone 2 <br />---- ---- <br />----------- 100.005 <br />---------- N%A <br />--------------- N%A <br />----------- f0.59 <br />------- 50.93 <br />-------- 50.61 <br />------- 50.47 <br />-------- SB.SE~ <br />------- 52.06 <br />-------- 10.45 <br />------- 50.00 <br />-------- <br />ADJUSTEO COST SUBTUTALS -S.SHIFi -20HE A: 52.59 SI.SD 50.59 SD.93 50.61 f0.41 fE.58 52.08 50.45 SU.00 <br /> -70NE 8: f2.59 51.30 50.59 50.93 50.61 50.47 58.58 52.08 f0.4S SO.OU <br /> -D.SHIFTS -IOHE A: SI.95 50.65 50.59 50.93 50.6] SO.d7 38.58 32.0$ 30.45 SU.DO <br /> -IONE B: f1.95 50.65 50.59 50.93 50.61 50.47 SE:.58 52.08 50.45 50.00 <br /> -i.SHIFTS -7GNE A: 11.73 50.43 50.59 50.93 50.61 50.47 58.58 12.08 30.45 50.00 <br /> -70NE B: 51.13 20.43 50.59 50.93 50.61 50.41 58.58 52.08 50.45 f0.00 <br />