My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC44225
DRMS
>
Back File Migration
>
Inspection
>
INSPEC44225
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:47:28 PM
Creation date
11/18/2007 11:35:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982011
IBM Index Class Name
Inspection
Doc Date
11/18/1994
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NHEEL LOADER COST 6 PERFORMANCE DATA NORISHE~ont'd <br />Model: CAT 966C <br />ADJUSTED COST SUBTOTALS <br />------------------ --- Ownership Costs -- <br />Loader, Attach~ents tl 6 12: <br />Single shifts 514.05 <br />Double shifts 510.53 <br />Triple shifts 59.37 <br />HOURLY OPERATOR NA6ES <br /> Base <br />Labor Classification Rate <br />Loader operator (l=6cy) 514.30 <br />Loader operator () 6cY) 514.45 <br />Mechanic <br />------------------------------ SI4.60 <br />----------- <br />HOURLY EOUIPNENT COST SUHNARY <br />56.61 <br />53.31 <br />52.20 <br /> <br /> <br />sheet 2 of 2 sheets <br />-----;------------------- Overhaul 6 Operating Costs -------------------- <br />Loader L Attach~ent I1: <br />54.21 51.28 53.14 51.61 52.51 S6.I9 21.80 52.64 50.29 <br />52.13 Attachoent 12: <br />51.42 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 <br />Fringe F.I.C.A Une~pl. Nk. Co~p. Total I Shift <br />Benefits 7.702 6.202 12 .SOZ IS/hr); Differential ; <br />f3.50 51.10 50.89 51 .79 521.58 Day 50.00 ~ 2 shift/day avg.: 50.15 <br />53.50 51.11 50.90 51 .81 521.76 ~ Swing: 50.30 ~ 3 shift/day avg.: 50.25 <br />53.50 <br />----------- 21.12 <br />----------- 20.91 <br />------- 51 <br />---- .83 <br />----- 521.95 ; <br />-------- Night: 20.45 <br />------------------------------------------ <br /> Ownership ; ---Operating 6 Overhaul Costs--~ Operator ) Total <br /> Costs ~ loader, Att.ll Attachoenl 12 ~ Costs ~ Cost/HR IS) <br /> <br />Single shifts 524.92 S1v.45 50.00 521.58 565. 95 <br />Double shifts : 515.91 519.45 50.00 521.73 557. 15 <br />Triple shifts 512.99 519.45 SU.00 521.83 254. 21 <br />-------------------------- <br />------------------------- <br />[GUIPMENT PERfORNANCE DATA <br />- - EUUIPHENT SPECIFICATIONS - - - <br />'~----------Diaensions lfU-----------; <br />Nacl~ir~e Hake 6 Hodel Trans~ission ) Fuel Type ~ Horsepower Lenglh ~ Nidth ~ Height ~ Neight (tons) <br />Cv~T 966C Power shift Diesel 170.0 22.58 9.58 11.11 18.44 <br />Clearance ~-Capacity icu. yds.)-! Maz. Loading Basic Cycle Time <br />I TYPe Circle Ift.)I Struck Heaped .Height (f t) )load, ~nvr, dU~D) <br />Loader Bucket: GP w/teeth 44.50 3.43 4.00 9.6ti 0.525 sin. <br />GROUND SPEEDS (Fps) p Rated Engine P.PH <br />Iranseission Gear: 1st 2nd 3rd 4th <br />forward: 378 r',i8 1,170 1,910 <br />reverse: 431 757 1,311 2,130 <br />
The URL can be used to link to this page
Your browser does not support the video tag.