Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was a complete inspection of the Coal Gulch Mine conducted by Tom Kaldenbach of the Colorado Division <br />of Minerals and Geology. No one else was present. <br />The permit for this mine was revoked more than 10 years ago. DMG's IML program had reclamation work done <br />on the site in September 1994. <br />The ground was covered with a few inches of snow. With the exception of snow having melted, the site <br />appeared as it did when I lasted inspected it in December 2005 (Tom Gillis has done the partial inspections since <br />then). There is a real estate For Sale sign on the site. <br />Roads <br />Vehicle access from Hwy. 160 into the Coal Gulch site was blocked with a cable. <br />Hvdroloaic Balance <br />The upper and lower ponds were dry. <br />Slides and Damaee <br />No problems with slope stability or erosion were evident. <br />General Mine Plan Compliance <br />No problems were evident at the Coal Gulch site. <br />