Laserfiche WebLink
III. COMMENTS-COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during the <br />inspection. Comments also describe any enforcement actions taken during the inspection and the facts or <br />evidence supporting the enforcement action. <br />This permit is in temporary cessation. There is no operational, other than maintenance, activity at the <br />site. <br />Hydrologic Balance <br />There was a seep dischazge from Sedimentation Pond 1. There appeared to be a space about the gate <br />valve, but there was no flow from this potential source. The source of flow may be a deteriorated <br />primary spillway barrel. The dischazge was measured as 1 pint in 2'/z minutes (0.05 gal/minute, <br />0.0001 cu ft/sec). There was no dischazge from Pond 2. <br />Backfill and Grading <br />All backfilling and grading requirements, except for that during construction of the water line, are <br />associated with long-term facilities. There has been no other such reclamation to date. <br />Sunnort Facilities <br />Structures, other than the sedimentation ponds and ditches, aze in disrepair. Some structures have been <br />vandalized. Temporary repairs have been made. The barrel of the primary spillway of Pond 1 appeazs <br />to be rusting out. <br />General Mine Plan Compliance <br />No permitted work to covert the site from aload-out to a load-in facility had been accomplished. <br />Reve etg ation <br />There is no part of the disturbed area, other than buried pipelines, that has been revegetated in <br />accordance with the reclamation plan. Temporary vegetation protects un-reclaimed disturbed areas and <br />topsoil piles. <br />Air Resource Protection <br />The site is stable with regazd to air protection. There is no dust-generating activity at the site. <br />Slides and Damage <br />See Support Facilities There is a stabilized slide, recorded in May 2000, not inspected during this <br />inspection, at a cut on the railroad spur. <br />Reclamation Success <br />There has been no reclamation accomplished at this site. <br />C-1992-08 t, CP inspection of July l8, 2006, page 3 of4 pages <br />