Laserfiche WebLink
• (Page 4) • <br />MINE ID # OR PROSPECTING ID A' M•84-025 <br />INSPECTION DATE 3!17199 <br />INSPECTOR'S INITIALS RCO <br />The following problems IPBI and/or possible violations IPVi land suggested corrective actions! w re identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible iolations. The possible <br />violations should 6e corrected by the dates given to reduce their severity when considered by the fined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions tak n. <br />PR08LEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />The permit boundary markers were not visibly posted, and the boundary was not <br />adequately delineated at the site. <br />CORRECTIVE ACTION: <br />Pursuant to Rule 3.1.12, the operator must install markers adequate to delineate the <br />permit area boundary. The operator must submit evidence to the Division that the <br />markers have been installed, by the date shown at right. <br />The maps in the file do not accurately reflect the disturbance on the ground. <br />~DARECTION <br />/26 99 <br />B or PV: PB <br />OPICISI: SM <br />17(99 <br />CORRECTIVE ACTION: Pl~or PV: PB <br />The operator must prepare and submit new maps showing all mining-related T PIGS): AR <br />disturbance, by the standards described in Rule 6.2.1, and including the applicable <br />items described in Rule 6.3.5. These maps must be received by the Division by the <br />date shown at right. <br />3. The measurements and noted made during the inspection indicate that the operator Tai a Boas rd will set. <br />has affected an area outside the permit boundary, in excess of 10 acres. <br />PB or PV: PV <br />CORRECTIVE ACTION: T PIC(SI: OD <br />The Division will schedule this matter to be heard before the Board, at which hearing <br />the observation that offsite disturbance has occurred. The Board will determine <br />whether a violation has occurred, and will determine the corrective action and set the <br />corrective action date. <br />