My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC43886
DRMS
>
Back File Migration
>
Inspection
>
INSPEC43886
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:47:11 PM
Creation date
11/18/2007 11:34:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001088
IBM Index Class Name
Inspection
Doc Date
1/5/2006
Doc Name
Insp Rpt
From
DMG
To
Gary Rinderle Construction Inc.
Inspection Date
12/21/2005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 05-Jan-2006 Permit orjob no. <br />User : SSS Abbreviation <br />Filename <br />Agency or organization name :DMG <br />Permit orjob action :Routine recalculation <br />TASK LIST (DIRECT COSTS( <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />Oia -Cut and fill highwa/l reduction dozer 1 20.8 $2,572 <br />02a -Grade 5 acres of area at 2 foot depth dozer 1 40.0 $4, 963 <br />03a -Replace 4 inches of growth medium over 5 acres dozer 1 12.8 $1,578 <br /> task deleted <br />05a -Revegetate maximum 5 acres of affected area revege 2 16.0 $7, 950 <br />06a -Transport reclamation to/from site mobilize 3 2.5 $884 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 92.3 $17,947 <br />includes inflation factor adjustment of: NA <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT- Llablllty lDSUranCe <br />Performance bond <br />Job superintendent <br />Profit <br />State :Colorado <br />County :Mesa <br />TOTAL DIRECT COST'= $17,947 <br />2.02 % of direct total = $363 <br />1.05 % of direct total = $188 <br />NA` NA NA total = NA <br />10.00 % of direct total = $1, 795 <br /> TOTAL08P= $2,346 <br /> CONTRACT AMOUNT (direct+08 P)= $20,293 <br /> total = <br />NA NA NA total = NA <br />5.00 %ofcntr. NA total= $1,015 <br />NA` NA total = NA <br /> TOTAL INDIRECT COST= $3,360 <br />' not required (or eqp. operator serves as super.) <br />LEGAL -ENGINEERING -PROJECT MANAGEMENT - <br />Financial warranty processing (legal/related costs) <br />Engineering work and/or contracUbid preparation <br />Reclamation management and/or administration <br />CONTINGENCY - <br />' contingencies accounted /or at task level <br />M-2001-088 Site :Upland Gravel <br />none <br />M088-000 <br />TOTAL BOND AMOUNT (direct + indirect) _ $21,307 <br />
The URL can be used to link to this page
Your browser does not support the video tag.