Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name :DMG <br />Task # : 06B State :Colorado <br />sheet ~ of 2 <br />Date :01/04/2006 County :Mesa <br />User : SSS Site :Upland Gravel <br />Permit or other job action :Routine Recalculation <br />Task description :TIa/ISpOrt reClamafiOn egUll)/17ellt t0/ffOll7 Slfe <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $23.32 $25.78 $31.45 <br /> Operating cosUhour : $30.29 $31.74 $35.14 <br /> Operator cosUhour : $27.40 $27.40 $27.40 <br /> Helper cost/hour : $0.00 $25.15 $25.15 <br /> Total Unit CosUhour : $81.01 $110.07 $119.13 <br /> <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />CosUhr/unit Hauf Rig <br />CosUhr/unit Fleet Size <br />(NO. units) Haul Trip <br />CosUhr/fleet Return Trip <br />CosUhr/fleet DOT permit <br />CosUfleet <br />-Cat D7R Series 11 - 7SU 35.17 $40.61 $110.07 1 $150.68 $110.07 $0.00 <br />-Revegetatron equip. 20.00 $20.00 $81.01 2 $202.02 $162.02 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />PermiUjob # : M--2001-088 <br />Abbreviation :none <br />Filename : M088-O6a <br />