Laserfiche WebLink
~e S• ~E~ 1 e ~1' 1 xll 11 \ 1 iJ~ <br />li/Iine ~ige ~vaiuati®~a <br />State Program <br />1. Peemittee/Person 9. Permit Number 10. Permit Type <br /> ADIERICAN SAIELD COAL CO_ C-015-81 PP <br /> 2. Address 11. Field Visit Date 12. Purpose 13. SRA Present <br /> 10830 N. CENTRAI, EXPRESS«r 04/26/2002 <br />3. City 4. State mm - dd - }'>yy <br /> 14. Permit Status I5. Site Status 16. Facility Type <br />DALLAS TX <br />AB FR D <br />5. Zip Code 6. Phone Number <br /> 17. OSM Office ~ 18. CCTD ~ 19. Land Codc <br />75231 {214) 692-7872 <br />140 <br />7. Operator Name. if Different than Permittee <br /> 20. vt.S.H.A ID ; 21. Stat e Abrev. 22. County Name <br /> DM G - SITE RE V OKED <br /> IIZESA <br />i <br />N Oo--03170 CO <br /> ame <br />S. rl4 <br />ne <br /> 23. AVS Permittee Entity ID Number 24- State Office <br />FRUITA 1 & 2 <br /> 125973 <br />Z~. Hours 26. g r B ~ 27. Reviewing Official: <br />0.0 a. Permit Review <br /> Sign tore: Signahrre: <br />p b. Site Visit Time <br />2 <br />, ~aTCH RO LIN SID # 370 <br /> <br />Travel Time <br />e Review Date: / / <br />. <br />S.U r <br />Printed N mte: <br />m m - dd - yyyy <br /> <br />I,p d. Report Writing <br />Date: 03/30/2005 ~ <br />[s Supplemental \7SE Page Used Y/N~.1 . <br />Fermi[ Type -Item 10 IP =Inierim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR....Ciiizen Complaint Referral (non site visit) <br />pyx ..Oversight P.Fx.... Reclamation Fees CC_.._ Citizen Complaint {initial site visit) <br />Axx.... Assistance Fxx._.. Federal Actions CCF..,. Citizen Complaint Follow-up <br />Joint Inspection -Item 73 Ajoint inspection is when a state Inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 74 A9.... Abandoned: Ait surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active; Coal mining and reclamation activities occurring or 30 CPR 840.11(8) <br />permitted but not yet disturbed. AB1..Bond Forfeiture: Bond forfeiture offcially in process or completed, and. <br />IN.._ Inactive (Permanent.Prooram Permit): Phase II completed or reclamation in proyrass or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) AB2..Partially Reclaimed Forteiiure: rorfeitad site where all bonds have bean <br />Coal mining completed and reclamation aciiviiias rnitiatad. used to reclaim site, but site not reclaimed to Program standards. <br />BR... Bond Release: Reclamation completed and State Regulatory A83.. Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program sandards. <br />Authority (RA) nos released all of the bond (Phase III Release.) NA...Not Applicabl=: When sit= is unpermitted. <br />Site Status Codes -Item 16 NS_ Non-Site Vsit: Status of site not determined <br />ND._No Distw Sauce: No coal mining and reclamation MC..Mining Complete: No mining zctivity qn site, FP.. Forfeiture Pending: The RA is pursuing <br />operations have been started. site regraded and awaiting phase bond release. acrons io revoke the permit; collect the <br />FK_ Coal Erploraiion: Coal °rploraiion operations TG.Temporary Cessption: Th= P.A has granted performance bond(s), and/or reclama- <br />have storied and where coal miramg opertions cessation of minrng pursuent to 30 CF,R 818/ 'irn cf formed sit= r; rn aroaress. <br />have not beggun. 817.131 (b). FP,_ Forfeited and P.edaimed: ForfeiWre <br />AP.. Active Coal Producng: Coal surface mining P1...Phase I Release: At least Phase I bond release redamaiion completed. <br />activities are occurring. granted for entire permitted area. For Inierim FO_Abandoned Siie: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permrs, partial bond releas=. is permitted but there is no bond. <br />facility such as tipple or preparation plant. P2.. Phase II P,_lease: At least Phase II bond release WC.~/dildwt Coal mining and reclamation <br />NPV7..No Mining: The Permit Status rs acive, site is forth= entire permitted area. op=rations have or are taking plat= and <br />not In Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation comp/etetl and the activity is not covered by the <br />mining activity, and site not reoradetl. the RA has released all bond. required permits irom the PvA. <br />Facility Type Codes -Item 16 p ..ancillary (Haulroad, Conveyor, and/or „ails) H...Exploration Permits - L.. Remining sit= oermi5ed <br />A._ Surfacz E... Raiusa and/or Impoundment L.. Notice of Intent io Explore under 30 CFR786.25 <br />B... Underground F._ Loading Facility and/or Tipple J... Exempt 1o and 2l3 <br />C... Preparation PIaM G... Srockpies K_. Government Financed Construction Exemption <br />Small Business Re~ulatorv Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agricrilhu-e Regulatory Enforcement Ombudsman and 7 0 Regional Fairness Boards +rerz established to receire commens fron <br />small bn;messes about Federal agency enforcement actions. The Ombudsman will annually evaluate fbe enforcement activities and rate each aeencds <br />j responsiveness to small business. If you era a small'nnsioess (a business u'Sth 500 or fewer emplo` ecs iachiding those of affiliates) pyve 1 of <br />~ <br />~ and wish to comment on the enforcemcnt or compBanec aeinities of OSRI, call 1-8SS-REG-FAIR (7-SSS-734-3247). <br />s_,~orr~„v~,a_+yya <br />