My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC43829
DRMS
>
Back File Migration
>
Inspection
>
INSPEC43829
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:47:08 PM
Creation date
11/18/2007 11:33:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
7/12/2001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was a complete inspection of the New Horizon Mine for the month of July, 2001. The purpose of this <br />inspection is to conduct normal operations and environmental compliance. The weather was clear and <br />warm. <br />AVAILABILITY OF RECORDS: Records were inspected and found to be incompliance. See page 5 <br />of this report for further details. <br />ROADS: Haul roads and the BB road detour was inspected and no problems were noted <br />HYDROLOGIC BALANCE: Mine 7: Ponds 1 and 6 had water in them but only 1 was discharging as <br />normal, all other ponds were dry. Alt ditches and culverts are functianing as designed. Mine 2, Pond 7 <br />had water in it but was not discharging. All ditches and culverts were clear and capable of functioning as <br />designed. Pond 8 is completed. <br />BACKFILL 8 GRADING: B & G was in progress as is normal. No problems were noted. The land <br />continues to be reclaimed to the approved post mining topography map and no low spots were noted. <br />EXPLOSIVES: Records were inspected and found to be in compliance. All blasting procedures are being <br />followed and seismograph's readings are available for each blast. <br />TOPSOIL: Topsoiling this time is being accomplished with truck and shovel as time permits and is being <br />spread by dozers to the proper depth. A visual inspection of the recently topsoiled area indicated that the <br />appropriate depths are being obtained. <br />GENERAL MINE COMPLIANCE: The mine continues to exert an outstanding effort to comply with all <br />rules and regulations of the Colorado DMG. <br />RECLAMATION SUCCESS: The site is scheduled to submit a Phase II & III bond release on the <br />mine 1 area later this summer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.