Laserfiche WebLink
Seneca II Mine Phase I bond release, pQ. 4 <br />We began at road E-1, cross section #1, where we measured a 23' width and 4% slope. E-1, cross <br />section #2 was 20' wide and 5% slope. F road, cross section F-F' was 20' wide and 5% slope. <br />C road, cross section C-C' was 20' wide and 7% slope. The South road, cross section S-SR' was <br />21' wide and 6% slope. $ road, east of the Wedge Impoundment, was 24' wide and 2% slope. <br />This completed verification of the haul road cross sections, and completed the OSM portion of <br />the field inspection. <br />We held a close out meeting August 10 and Mr. Boulay did a thorough job of describing our <br />observations and the several erosion areas noted above. We emphasized trying to use hand <br />maintenance for the erosion areas to the maximum extent possible to avoid unnecessary <br />equipment impacts to reclaimed areas. We determined that the East Wedge Pit Area as described <br />above is not eligible for Phase I bond release. We discussed options for monitoring and/or <br />stabilizing the small slump above the Pecoco pond, and SCC should propose a plan for this area. <br />This concluded the OSM portion of this Phase I bond release inspection. <br />Please address any questions concerning this report to Henry Austin, Senior Reclamation <br />Specialist, at haustin(c~osmre.gov or to (303) 844-1400 x1466. <br />